The Shared Waters Enhancement & Loughs Legacy (SWELL) Project, funded by the EU INTERREG VA Programme, included for a major upgrade to the Inlet Works at Strabane WwTW.
Speak to Our TeamThis phase of BSG’s work at Strabane included demolition of the existing 6mm inlet works whilst using the existing structure to complete a new purpose built reinforced concrete Structure to hold 3 No 250 l/sec rated Screw Pumps working in Duty/Assist/Standby arrangement. With new flow balancing and control functions the downstream processes are better equipped to process the receiving flows and loads. New MCC & SCADA controls allows for full automatic operation and monitoring.