The primary driver associated with this scheme was the resolution of unscreened effluent from the local network to Belfast Lough.
Speak to Our TeamWorks included screen structure to facilitate install of 25mm screen & 2nr 6mm screens on an existing overflow foul line, cofferdam install and concrete works, Inter-connecting 1200mm concrete install, flow diversion, access flooring and bar screen installations, screen installations and associated compaction equipment and skip trolley, washwater system installation and launder system, MCC and kiosk installation, instrumentation and systems integration, Potable water booster set with air break and storage tank and retractable hose.