The Contract was for the provision of a flood wall approximately .m above existing ground level at the highest point.
Speak to Our TeamDrainage is provided to the rear of the wall to ensure there is continual drainage to reduce any risk of future flooding from runoff.
The flood wall with decorative features, is approximately 130m in length and its structure consists of a sheet pile foundation, reinforced concrete capping beam and textured reinforced concrete retaining wall.
The flood wall is designed to reduce the risk of flooding from the nearby watercourses, the Canal Back Extension and Coalisland Mill Race to properties at Dernmore Drive, Clonoe
Explore More Projects
View all Harbours / Marine / Rivers ProjectsReady to Start Your Next Project?
Whether you have a clear vision or need expert guidance, we’re here to help bring your ideas to life. Get in touch with us today to discuss how we can support your goals and deliver outstanding results.



