Harbours / Marine / Rivers

Clonoe FAS

The Contract was for the provision of a flood wall approximately .m above existing ground level at the highest point.

Speak to Our Team Phone icon

Drainage is provided to the rear of the wall to ensure there is continual drainage to reduce any risk of future flooding from runoff.

The flood wall with decorative features, is approximately 130m in length and its structure consists of a sheet pile foundation, reinforced concrete capping beam and textured reinforced concrete retaining wall.

The flood wall is designed to reduce the risk of flooding from the nearby watercourses, the Canal Back Extension and Coalisland Mill Race to properties at Dernmore Drive, Clonoe

Speak to Our Team Phone icon
Contact Our Team

Ready to Start Your Next Project?

Whether you have a clear vision or need expert guidance, we’re here to help bring your ideas to life. Get in touch with us today to discuss how we can support your goals and deliver outstanding results.

Send us your CV

Send us your CV

Maximum file size: 67.11MB

GDPR